
Ashland 2811E





Ashland 2811E





Ashland 1410E

Ashland 1812E
نشرت: 1السنة
The seller didn't indicate the price
This ad is stored in the archive for reference (specifications, typical price). There are no outdated ads on the site — all active options can be found below.
Production Cycles 25.57 Average haul road speeds (KPH) 90 Loading and unloading times in seconds (Average) 1000 Total distance of travel in metres (Round trip) 90% Load factor efficiency 90% Availability Factor Operating Results 19.27 Cubic metres per cycle 3.85 Cycle time in minutes 15.60 Cycles per hour 300.6 Cubic metres per tach hour 541,084 Cubic metres per year Production - times can vary based on the materials and conditions The production cycles were recorded in Iport, Doncaster by Williams Plant Hire
هذا العرض لأغراض المعلومات فقط. يرجى تأكيد التفاصيل مباشرة من البائع.
The seller didn't indicate the price
هذا العرض لأغراض المعلومات فقط. يرجى تأكيد التفاصيل مباشرة من البائع.







